Project origin
Collectif Santé Montréal (CSM) | Construction - New build
Akonovia Mandate
Calibrate the initial energy modelling (reference building) according to ASHRAE 14–2002 methodology
Compare the simulation with the real building
Analyze the uncertainty of the energy model
The new CHUM is an immense hospital complex that includes 1, 000 000 ft² of new buildings and 968 751 pi² of rehabilitation/redevelopment. The facilities include a new 18-story, 772-bed hospital, as well as an 11-story research centre connected to an existing office building.
This large-scale, highly complex project demonstrates Akonovia’s level of expertise in energy efficiency, energy modelling, and measurement and verification.