Carré St-Laurent

42
%
Économies sur la facture énergétique
Energy savings
tco2
Réduction sur la facture énergétique
GHG EMISSION REDUCTION
tco2
Réduction sur la facture énergétique
LEED
Gold
In preparation for obtaining

Le projet

The Project

Lieu
Place Rental
Downtown – Montreal
Superficie
Area
32 028 m2
pi2
ft2
Commercial
Projet de rénovation
Major Renovation
Nouvelle construction
New construction

Project to rebuild a 13-storeys commercial building with an area of 32,028 square metres, including offices, underground parking lots, a food fair and a museum. The building was designed and built according to the requirements of the 2009 GOLD LEED certification.

Carré St-Laurent

Mesures efficaces

Effective measures

  • Integrating a geothermal loop
  • Heat recovery via cooler and elimination of steam demand for heating
  • Optimizing the control sequences of heating and air conditioning loops
  • Heat recovery via an enthalpic wheel
  • LED lighting
  • Efficient envelope

Mandat Akonovia

Akonovia mandate

  • Application for grants
  • Measurement and Verification Plan

Nos autres projets

Our Other Projects